LCM23 Tiger Tracks Women's Curved Basketball Shoes With Thick Soles
LCM23 Tiger Tracks Women's Curved Basketball Shoes With Thick Soles
Regular price
$156.66 USD
Regular price
$156.66 USD
Sale price
$156.66 USD
Unit price
per
Tax included.
Shipping calculated at checkout.
Couldn't load pickup availability
Complete with eyelets and a lace up closure for a classic look
- The upper is made of leather and the sole is made of Rubber
- Feature:Fashion Trend, Anti-Slippery, Hard-Wearing, Shock-Absorbant
- Season: Autumn, Spring, Summer, Winter
- Occasion: Outdoor, Sports
- Gender: Women
- Care Instruction: Spot clean only
- Custom area is the upper, for custom areas please refer to yoycol mockup generator for details
- This product is made on demand. No minimums
- Multiple shipping options available, and cost varies on time efficiency.
Size Guide
| inch | Foot Length | 8.9 | 9.1 | 9.4 | 9.6 | 9.9 | 10.2 | 10.5 | 10.6 | 10.9 |
| cm | 22.5 | 23.1 | 23.8 | 24.4 | 25.1 | 25.9 | 26.6 | 27 | 27.8 | |
| EURsize | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | |
| US Size | 5 | 6 | 7 | 7.5 | 8 | 9 | 10 | 11 | 12 | |
| Product measurements may vary by up to 3~5mm | ||||||||||
How to Measure:
1、Place your foot on the blank paper
2、Mark the end of your heel and the tip of your longest toe
3、Measure the length with a ruler
Note:IF your foot length is between two value,please chose the large one
